TECHNICAL VISIT: TUANKU JA'AFAR POWER STATION, PD ***REGISTRATION FULL**

Place: Aras 3, Dewan Bagan Pinang, Bangunan Pentadbiran, Stesen JanaElektrik Tuanku Ja'afar, Port Dickson | City: Port Dickson, Malaysia
INTRODUCTION
TUANKU JA'AFAR POWER STATION, PORT DICKSON
Tuanku Ja’afar Power Station was initially built as a conventional power plant and commences its operation in 1969 with 4×60 MW units. By 1978, its generating capacity was increased from 240 MW to 625 MW. TJPS delivered its generated power to the National Grid System via 132 kV and 275 kV transmission lines. After operating for more than 30 years and exceeding its economic life, TJPS conventional power plant was finally decommissioned in May 2004. Under TJPS Rehabilitation Project, TNB decided to replace the old plant with 2 blocks of 750 MW Combined Cycle Power Plant (CCPP). Both CCPP are of high efficiency and environmentally friendly gas-fired CCPP, utilizing state-of-art technology and employing industry best practices in power generation.
The project consists of 2 phases:-
• PD1 – The MHI 750 MW CCPP Project
• PD2 – The GE/TOSHIBA 750 MW CCPP Project
TJPS plays a vital role in promoting clean power generation in Malaysia by using highly efficient and clean-burning equipment. TJPS placed itself as one of the best power plants among MHI’s M701F Gas Turbines fleet worldwide.
LEARNING & OUTCOME
- Learn and understand the concept of Combined Cycle Power Plant.
- It helps participants gain first-hand information regarding the maintenance and operation of the Tuanku Ja’afar Power Station.
- This also serves as a relationship-building process between the institution and industry.
So, come and join us for this technical visit to enhance your knowledge about Combined Cycle Power Plant.
AWARDS & RECOGNITIONS
- TNB President’s Quality Award Winner 2006.
- 5S National Award Winner (Services Category) by NPC 2006.
- National OSH Award (Services Category) from the Department of Occupational Safety and Health 2007.
- 5S TNB Award Winner (Services Category) 2009.
- AKP Finalist 2009.
*CLOSING DATE: **REGISTRATION FULL**
.
Please email to: This email address is being protected from spambots. You need JavaScript enabled to view it. or fax to 06-6010725
Schedule
TIME | PROGRAMME |
08.30 am | Registration all participants at IEMNS Branch |
08.45 am | Depart to TJPS, Port Dickson |
9.45 am | Arrival at TJPS, Port Dickson |
Morning Tea at L3 lobby | |
10.30 am |
Safety Briefing & Welcoming Address |
10.45 am |
Briefing on Station overview by Ir. Balbir Shah |
Briefing on Plant Operation by Ir. Prem Rakesh |
|
11.30 am |
Plant Tour (by Ir. Che Yuswadi & Ir. Md Hajuperi Md Ali) |
1.00 pm |
Lunch & End of Visit |
Photo Session |
Fee
REGISTRATION FEE |
||
IEM MEMBER | IEM STUDENT MEMBER | NON MEMBER |
RM50.00 | RM30.00 | RM70.00 |
Port Dickson, Malaysia
Map
All Dates
- Monday, 07 October 2019 10:00 AM - 01:00 PM